This week, Streetscape crews completed concrete pours and installed brick pavers at the Midblock Crosswalk. They also installed light pole foundations and future public art foundations.

Infrastructure crews completed the 4″ water meter vault north of Cabarrus Avenue. With the vault installed, the water line work up to the Library is complete. Next, crews will begin stormwater installation within the work zone.

Heads up! The next (and final) fence shift is tentatively scheduled for September 16th up to Killarney Ave.

Come Downtown and check out the progress on Union Street for Art Walk on Saturday, September 7th from 11 AM – 4 PM!

To stay updated on the Downtown Streetscape Project follow us on Facebook, Instagram, and X (Twitter)!

4″ water meter vault at Hotel Concord
4″ water meter vault at Hotel Concord
Tack between lifts of Asphalt on Union St S
Paving on Union St S!
Paving at Midblock Crosswalk
Midblock Crosswalk Ramp
Installation of Pavers at Midblock Crosswalk

 

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC