This week Downtown Streetscape crews completed installation of all active water and sewer service within the construction work zone.
Night work occurred during the evening of Thursday, August 31 into the early morning of Friday, September 1. They capped the existing 8″ and 10″ water lines and Corban Ave and the Midblock Crossing and connected an existing line on Barbrick Ave to the new 16″ water line on Union Street. It was a lot to do in one evening and crews worked diligently through the night to complete it!
We continue to have events in Downtown Concord and lots of things are happening in September!
Stay up to date with the Downtown Streetscape Project and what’s happening in Downtown Concord follow us on Facebook,Instagram, and Twitter!
8-inch Water Line abandoned at Corban Ave
Abandoned 8-inch Water Line at Corban Ave
Existing lines capped at Corban Ave
Pipe and Valve Demolition on Barbrick Ave
Barbrick old Pipe Demo
Barbrick Ave to Union St Water Line Tie-In
Existing Water Lines Capped at Midblock Crossing