This week, crews completed the soil cell installation and poured an 8-inch standup curb near the Courthouse. They also started installing irrigation and grading for sidewalks in that area.

Between Cabarrus and Corban Ave, light pole installation continues.

North of Cabarrus Ave crews completed the final tie-in for the main water line. Conduit and soil cell installation continues in this area as well. Roadway grading is complete up to the Library and next week crews are scheduled to install the stone base.

To stay updated on the Downtown Streetscape Project follow us on Facebook, Instagram, and X (Twitter)!

Tack in preparation of asphalt surface layer
Irrigation Service installation and Backflow
Electrical conduit installation up to Killarney
Curb Machine at the Cabarrus Arts Council
Curb installation at the 1975 Courthouse

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC