October 11, 2024 Streetscape Update

This week, Downtown Streetscape crews paved the final lift on Market St and Barbrick Ave. They also graded and poured the first 5ft of sidewalk on the west side of Union Street from Cabarrus to Hawthorne’s Pizza, installed irrigation lines south of Cabarrus, and started installing decorative fencing.

Infrastructure crews are wrapping up the main water line connections at Killarney today and will work on the final two connections next week.

The electric conduit was installed in front of the 1975 Courthouse, part of the roadway was demolished, and soil cell installation started.

To stay updated on the Downtown Streetscape Project follow us on Facebook, Instagram, and X (Twitter)!

 

Final lift of asphalt on Market Street
Final lift of asphalt on Barbrick Ave
Final lift of asphalt on Barbrick Ave
First 5 Ft of sidewalk on west side of Union St N
Installing irrigation lines
Installing irrigation lines
Decorative fence installation on east side of Union St S

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC