June 28, 2024 Streetscape Update

Downtown Streetscape crews continued installing the new water line through the intersection of Union Street and Cabarrus Avenue. In addition to water line work, crews set a new sewer manhole and are installing new sewer mains in the intersection.

They also installed landscape drainage pipe, excavated for soil cells, poured foundations for two of the four festoon poles, and poured concrete at the connection to the Courthouse Plaza as shown in the images below.

Next up, work will continue in the intersection and the sidewalks with formwork for new sidewalks installed on the east side of Union St soon.

To stay up to date on the Downtown Streetscape Project follow us on Facebook, Instagram, and X (Twitter)!

Cabarrus Avenue Intersection
City GIS staff mapping out new water main on Cabarrus Avenue
Pressure testing new water main to center of Cabarrus Avenue Intersection
Soil Cell excavation
Landscape drainage installation
Rebar cage for Festoon Pole foundations
Rebar for concrete at the Courthouse Plaza
Heavy-duty concrete pour for brick pavers at Courthouse Plaza

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC