✔ Completed pressure testing the new Main Water Lines.
✔ Installed a fire hydrant on Union Street near Means Plaza.
✔ Completed the 42″ stormwater drainage pipe installation from Barbrick Avenue to Union Street.
They’ve also begun working on the 36″ stormwater drainage installation across Union Street working towards the Courthouse.
Next week, crews will construct a new manhole near the intersection of Barbrick Avenue and Union Street and continue stormwater drainage pipes in front of the Cabarrus County Courthouse. Crews will be working in the sidewalk in front of the Courthouse to complete this work. The sidewalk in this area will be closed but pedestrian detours will be available.
To stay up to date with the Streetscape Project and what’s happening downtown follow us on Facebook,Instagram, and Twitter!
Fire Hydrant assembly installed 4/17/23
Union 36 inch storm excavation 4/19/23
Union 42 inch completion at Barbrick Ave 4/19/23
36 inch storm drain installation 4/20/23
Excavation under existing 8 inch and 10 inch Water Main Lines