Construction Updates

November 1, 2024 Streetscape Update

Streetscape crews continued installing conduit and grading the roadway north of Cabarrus Avenue. They also started installing the stone base in the roadway and pulled the string for curb installation, which is scheduled for next week.

South of Cabarrus Avenue all light poles were installed except two to be installed near the 1975 Courthouse Renovation. Three of the four festoon poles have also been installed.

At Corban Avenue, crews poured the curb, installed granite restraints, installed ADA ramps, and poured the concrete base in preparation for brick pavers. Crews also graded the sidewalk in this area.

Finally, asphalt crews installed the final lift from Cabarrus Ave towards the Courthouse Plaza connection.

To stay updated on the Downtown Streetscape Project follow us on Facebook, Instagram, and X (Twitter)!

Union St N subgrade
Union St N stone installation
Stone prep on Union St N
Rebar install at Union St S and Corban Ave
NE Corner of Union and Corban
Rough grade for sidewalk at Courthouse
Tack for final asphalt lift
Final lift
Final surface
Streetscape final asphalt lift
Final asphalt lift on Union St S

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC