This week, Downtown Streetscape crews paved the final lift on Market St and Barbrick Ave. They also graded and poured the first 5ft of sidewalk on the west side of Union Street from Cabarrus to Hawthorne’s Pizza, installed irrigation lines south of Cabarrus, and started installing decorative fencing.
Infrastructure crews are wrapping up the main water line connections at Killarney today and will work on the final two connections next week.
The electric conduit was installed in front of the 1975 Courthouse, part of the roadway was demolished, and soil cell installation started.