May 3, 2024 Streetscape Update

Downtown Streetscape Crews have been hard at work. Last week they finished the 285 LF of sewer installation up to Cabarrus. This week they worked on installing the 30″ stormwater drainage pipe up to Cabarrus on the west side of Union Street. Next week, they’ll move to the east side and install 18″ and 15″ stormwater pipes, again working from the Midblock to Cabarrus Ave.

Sidewalk crews completed installation of brick pavers on Barbrick and from Barbrick to Corban Ave including two of the crosswalks in the roadway. They also started installing landscape drainage pipes on the east side of Union Street.

Don’t forget to come Downtown for an event organized by Downtown Businesses, Shop Small for Mom, on Saturday, May 4th from 11:00 am-3:00 pm.

Stay up to date on the Downtown Streetscape Project by following us on Facebook, Instagram, and X (Twitter)!

Brick Pavers at Corban Ave and Union St
Building a Double Curb Inlet
30-inch Storm Installation
Drainage Pipe for Planters
Prep for Crosswalk at Barbrick Ave
Brick Pavers at Brabrick Crossing
Prep for Brick Pavers at Barbrick Ave and Union St

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC