Construction Updates

October 20, 2023 Streetscape Update

Now that all the new water lines and stormwater drainage pipes are installed and working, Downtown Streetscape crews spent much of this week demolishing the old roadway and abandoning and removing the old sewer lines, utilities, and stormwater drainage pipes.

In the pictures below you can see the Union Street side of the box culvert we showed last week. Now that our new storm drainage pipes are installed on Market St and Barbrick Ave this box culvert is no longer needed and has been capped and abandoned on the Union Street side.

Holiday Season is around the corner! Save the date for…

Candy Crawl – Tuesday, October 31, 3-5 p.m.

26th Annual Concord Christmas Tree Lighting – Friday, November 17, 6-8:30 p.m.

95th Annual Concord Christmas Parade & Santa Scramble – Saturday, November 18, 2:30 p.m.

National Small Business Saturday – Saturday, November 25

Stay up to date with the Downtown Streetscape Project and what’s happening in Downtown Concord follow us on Facebook, Instagram, and X (Twitter)!


Demo of existing Box Culvert on Union St S
Demo of existing Box Culvert on Union St S
View inside of Box Culvert
Temporary Patch on Union Street from Water Line work last week
Union Streetscape Construction

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC