April 28, 2023 Streetscape Update

After all the rainfall we had in Downtown Concord this week, we got to see the recently completed 42-in. stormwater drainage pipes within the construction zone in action!

Additionally, Downtown Concord Streetscape crews were able to complete the installation of the 36-in. stormwater drainage pipes across Union St. from Barbrick Ave. toward the sidewalk in front of the Historic Courthouse.

The sidewalk in front of the Cabarrus County Courthouse will remain closed for another week as crews work to install stormwater drainage pipes in that area, however, two temporary midblock crosswalks will remain in place to allow easy access for pedestrians.

36-in Reinforced Concrete Pipe (RCP) Storm Drainage Installation
Backfill of 36-in RCP at Union St and Barbrick Ave
Concrete Base for new Curb Inlet #19
Stormwater Manhole #3 Built around existing water lines – Temporary
Another view of Stormwater Manhole #3 at Barbrick Ave

Stay informed

Get the latest information about the revitalization of Concord Downtown.


© All rights reserved. Design by Perry Productions

Concord Downtown 704-920-6130
30 Cabarrus Avenue W 28026 Concord, NC